
Service area
Custom pool builder in Bradenton
A 15′ × 24′ pool in Hillwood Preserve, under a bronze screen enclosure with a doggy door in it — small on purpose, and run entirely on Pentair equipment.
What we built in Bradenton
The work behind this page: Hillwood Preserve.
Hillwood Preserve
Small deliberately. 15 feet by 24 at 3.5 to 5.5 feet, anchored by a 6′ × 7′ sunshelf. The smaller footprint keeps maintenance down while staying ample for entertaining, swimming and cooling off. The interior is PebbleTec Pebble Brilliance in Majestic Sound, natural aggregate blended with glass beads. Deck and coping are Shellock pavers in tan by Artistic Pavers: 16×16 decking against 16×8 bullnose.
- Pool
- 15’x24’
- Depth
- 3.5 to 5.5ft
- Features
- 6’x7’ Sunshelf
- Interior finish
- PebbleTec Pebble Brilliance Majestic Sound
- Waterline tile
- RIV-1256 by LuvTile
- Decking
- Shellock 16x16 in Tan color by Artistic Pavers
- Coping
- Shellock 16x8 bullnose in Tan color by Artistic Pavers
- Pump
- Pentair Intelliflo3 3HP Variable Speed Pump with Relay Board
- Filtration
- Pentair cc150 Cartridge Filter
- Sanitizer
- Pentair I-Chlor 30 Salt System
- Heater
- Pentair UltraTemp 140k BTU Heat Pump
- Lights
- Pentair Microbright LED Color Changing
Photographs from Bradenton
Photographs of the finished work — and, on some of these builds, the middle of it.






The enclosure is part of the build
A bronze aluminum screen enclosure covers the whole space, with two downspouts for drainage, two standard doors — and a doggy door.
The mesh is upgraded Super Screen no-see-um: a finer weave that keeps out the smallest biting insects and holds up under UV. On a Florida lanai that is the difference between using the space in the evening and not.
Questions about building in Bradenton
Do you build the screen enclosure as well as the pool?
On the Hillwood Preserve build in Bradenton, yes: a bronze aluminum enclosure with two downspouts, two standard doors, a doggy door and upgraded Super Screen no-see-um mesh.
Why build a smaller pool?
Lower maintenance, while staying ample for entertaining, swimming and cooling off. The Bradenton pool is 15′ × 24′ with a 6′ × 7′ sunshelf holding the shallow end.
How long does a pool take to build?
About eight weeks once HOA approval and permits are complete, depending on design complexity, weather and material availability. After the pool is filled we run 28 days of startup maintenance while the interior finish cures and the water chemistry balances, and every pool we build carries a 5-year workmanship warranty.
Nearby builds



Thinking about a pool in Bradenton?
Tell us the address and roughly what you have in mind. You will get a conversation, a 3D rendering, and options — not a pitch.
